The final year of the program concluded with the
implementation of 30 projects approved by the CANRI Board. The suite of
projects encompassed the major themes (Systems, Quality & Standards,
Products & Services, Communications, Coordination, Data) addressed in
CANRI's business
case. The majority of project outcomes are now available through the
NSW Natural Resource Atlas web portal, demonstrated to the Board and other stakeholders
at the Project Expo on 24 September 2004.
The table below summarises the status and outcomes of 2003-2004 projects.
|
ID
|
Project name
|
Short Description
|
Agency
|
CANRI Cost ($K)
|
Project Status / Outcome
|
|
29
|
PlantNET infrastructure - Integration with BioNet and CANRI
|
Improve the stability of IT infrastructure & functionality of PlantNET for on-going web-access and improving linkages to BioNet and CANRI (State Initiatives), and Australia's Virtual Herbarium (National)
|
DEC
|
52
|
Complete
PlantNet
|
|
27
|
Integration with BioNet
|
Enable the species collections data being served currently via the BioNet application, to be served through to the public via the CANRI framework.
|
DEC
|
110
|
Complete
BioNet
|
|
16
|
Web Keys
|
Deliver web-based interactive keys on several beetle groups for New South Wales - Leaf Beetles and Stag Beetles.
|
Museum
|
50
|
Complete
FaunaNet
|
|
20
|
Fauna Master Names List
|
Harvest names from the Australian Museum's Fauna Collections and the literature and include them in the NSW Fauna Master Names List.
|
Museum
|
30
|
Complete
FaunaNet
|
|
24
|
Forests data serving
|
Serve SFNSW data through the Bionet system.
|
DPI
|
15
|
Complete
BioNet
|
|
23
|
Anglers' Oracle
|
A ‘one stop shop’ for information of interest to recreational anglers.
|
DPI
|
45
|
Complete
Data available at: NRAtlas
|
|
44
|
Fisheries BioNet
|
Provide additional data to Bionet (or an alternate public portal) enhanced datasets as well as working with the Bionet development team to ensure that Fisheries data provided via a public interface to Bionet is appropriately validated.
|
DPI
|
20
|
Complete
BioNet
|
|
22
|
Complete RAMS Far West remediation
|
A continuation of the 02/03 CANRI project, RAMS FarWest. Appraise the RAMS database’s overall integrity and reliability, correct GIS topological and misclassification errors in this extensive database, patch a number of temporal gaps, and deliver a set of a generalised grids to the public domain through the CANRI webmapping structure.
|
DEC
|
12
|
Complete
Data available at: NRAtlas
|
|
21
|
Geology Data Customisation
|
Making digital geology database easily understandable by the general community by translating it into "plain English"
|
DPI
|
15
|
Complete
|
|
26
|
Groundwater
|
Deliver information about groundwater bore location, lithology, construction and other relevant details using the CANRI framework.
|
DIPNR
|
25
|
Complete.
Data available at: NRAtlas
|
|
42
|
Agricultural soil classification
|
Will provide access to NSW Agriculture’s historical physical soil test data and soil classification maps.
|
DPI
|
16
|
Complete
Data available at: NRAtlas
|
|
43
|
Rangeland Reporting
|
Rangeland monitoring for Western division (flora species, changes and climatic environment)
|
DPI
|
0
|
Complete
Data available at: NRAtlas
|
|
4041
|
Vertebrate pest and weed infestation data
|
Vertebrate pest infestation data (including rabbits, pigs, wild dogs and goats) from surveys in 1997 and 2002 will be compiled, edited and provided to CANRI for web serving.
|
DPI
|
14
|
Complete
Data available at: NRAtlas
|
|
01
|
Coordination
|
CANRI program coordination
|
CANRI
|
94
|
CANRI
|
|
03
|
Maintenance
|
Investigate and report on the resourcing requirements and options for maintaining the CANRI framework and the products and services it supports.
|
CANRI
|
25
|
|
|
04
|
CANRI program review & evaluation
|
An arms-length assessment of the program in terms of the original CANRI Business Case, to meet reporting obligations on project benefits to the Office of Information Technology and Treasury.
|
CANRI
|
10
|
|
|
05
|
CANRI Communications
|
Communicate the existence of the CANRI program products and interact with the community to better meet their needs in relation to sharing and using natural resources data, products and services.
|
CANRI
|
57
|
Complete
Communication materials
|
|
06
|
Training for WebMapping product managers & data custodians
|
Develop training and training products for web mapping product managers & data custodians,
particularly those that sit outside of government.
|
NCC
|
20
|
Community Mapping for NSW
|
|
08
|
One stop shop: Review of CANRI linkages
|
Ensure that CANRI is linked into all relevant government website pages where appropriate.
|
CANRI
|
4
|
Complete
|
|
10
|
CMB engagement/ products
|
Deliver a regional web mapping application for the Southern Catchment Management Board (SCMB), and a pilot portal to investigate options for presenting Blueprint progress reports on the Internet.
|
CANRI
|
26
|
Complete
|
|
13
|
CANRI Site Redesign 02-03
|
Architecture, Catalogue, Open Apps and Usability projects were amalgamated to Site Redesign. The CANRI Site Redesign Project will redesign and rebuild the CANRI website to enable easier end-user access to the CANRI information resources, and effectively make the website a true online portal
|
CANRI
|
29
|
Complete
|
|
14
|
Standards
|
Extend the CANRI DIY Manual with a collection of documentation on the standards used in CANRI. These include OpenGIS standards, but also metadata standards, guidelines for web mapping and some data models.
|
CANRI
|
17
|
|
|
15
|
Data loading & training for agencies
|
The Technical Support Officer will provide assistance to CANRI agencies with 1) Getting core and priority datasets served via the CANRI Framework, and 2) Providing technical training to the agencies involved.
|
CANRI
|
107
|
Complete.
Data available at: NRAtlas
|
|
18
|
Data quality & usability
|
Review of all core and priority datasets, ie current and proposed datasets served or downloaded through CANRI to assess and remediate the quality and usability of the data and associated metadata.
|
CANRI
|
16
|
Complete.
Data available at: NRAtlas
|
|
28
|
Stable Framework
|
Undertake remaining priority actions required to achieve a stable, maintainable technical framework that will continue to support CANRI’s existing products/services into the future.
|
CANRI
|
85
|
|
|
37
|
MET Online network trouble-shooting
|
Define and document the Internet environment required within NRIMS agencies to enable data custodians to enter and edit NRDD metadata using MET Online.
|
CANRI
|
27
|
Complete
|
|
02
|
New NRIMS business case
|
NRIMS Steering Group prepare a business case and cost-benefit analysis to go to Treasury for a further round of capital funding beyond the CANRI Program.
|
CANRI
|
0
|
Complete
|
|
30
|
Web Access Management connect.nsw
|
Single (or reduced) sign-on for authorised users across a diverse set of restricted web resources.
|
CANRI
|
0
|
Withdrawn
|
|
17
|
NRRWQ - Water Quality Data
|
Selected water quality data from DIPNR's enterprise database approved for internet release.
|
DIPNR
|
25
|
Deferred
|
|
35
|
Spatial Data Interoperability - SDI Pilot connect.nsw
|
Connect LPI spatial databases to CANRI websites using open standards, to allow users to go directly to a named place without pan/zoom. Pilot for later use across all government websites.
|
LPI
|
20
|
Withdrawn
|